The La Loma plant in Jaén, like that of Enemansa, was acquired by Ence from Endesa at the end of 2016. Its capacity is of 16 MW and achieved a net production of 77 million KWh in 2017.

The plant, which has the latest technology and advanced systems for power generation, contributes to the electrical grid an amount equivalent to the consumption of a population of 30,000 inhabitants.