Magnon Green Energy’s Mérida plant has an installed capacity of 20 MW which allows it to reach an annual production of 160 million kWh.

It was built according to the Best Available Techniques as recommended by the EU for the transport, storage and production of energy from biomass.

The plant offers an optimum environmental performance thanks to our bet on a cycle with overheating and the incorporation of an effective bag filter to collect of combustion gases at the boiler outlet, among other technologies.